% Click on part number for drawing. The Duke Energy project coordinator will make the final decision whether it is permissible to use a flat pad. A separate secondary bus enclosure is required whenever the customer is installing more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. 0000017686 00000 n North American Electric Reliability Corporation (NERC) Standard FAC-001-3. 12-26 Pad-mounted secondary cabinet (3 of 3) Spec. 24-Pad and Pull Boxes o 24.01 Transformer Pads o FMO Drawings 24.01-11 Pour in Place Transformer Pads 24.01-12 Pour in Place Transformer Pads endobj 0000016425 00000 n . 0000001729 00000 n BROAD APPLICABILITY OF FAC-001-3 & THE SERC SUPPLEMENT REQUIREMENTS: The Generation reader should be aware that NERC Standard FAC-001-3 is applicable to both the FERC functional entity Transmission Owner and Applicable Generator Owner as written in section 4.1. 10 minimum from front of concrete.) 01/18/2023 at 10:44 ET / ETR $107.32 0.41 Copyright West LLC. If you continue to use this site, you consent to the use of cookies. (ft) 7. 0000015649 00000 n 9696-Pit-Box-Pad-1.pdf. Duke Energy Corporation Size 31.9 MB Category Business Compatibility iPhone Requires iOS 14.0 or later. Listed by: mwrublewski. If you continue to use this site, you consent to the use of cookies. Looking for a quote for your project? 0000011860 00000 n 0000001429 00000 n 82"x85" Duke . iPod touch Requires iOS 14.0 or later. 327703 Transformer Pad 40x45x4 Single Phase (25-167KVA), 327704 Transformer Pad 56x50x4 Single Phase, 327707Transformer Pad 75x60x7 3 Phase (75-500KVA), 327712 Transformer Pad 87x82x7 3 Phase (750-2500KVA), 2001315 Transformer Pad 40x45x4 1 Phase (25-50KVA), 2001316 Transformer Pad 52x44x4 1 Phase (75-250KVA), 2001317 Transformer Pad 66 x 74 x 4 3 Phase URD Transformer, 2001318 Transformer Pad 60 x 50 x 30 3 Phase 200 AMP DFSG, 2001319 Transformer Pad 75 x 86 x 36 3 Phase 600 AMP SG, 2001323 Transformer Pad 96 x 96 x 6 3 Phase URD Transformer, 2001324 Transformer Pad 96 x 76 x 6 3 Phase URD Transformer, 2001325 Transformer Pad 60 x 39 x 4 200A/600A SG Pad, 2117010 Transformer Pad 100 x 96 x 6 3 Phase URD transformer, Home Fort Thomas, KY 41075. Read about how we use cookies and how you can control them by visiting our Cookie Statement. 0000016162 00000 n Barrier must extend to the walls of the pit, from the top of the pad to the bottom of the pit and its top level must be level with the top of pad. Do Not Sell Or Share My Personal Information, Offers a simple rugged design for a strong foundation. Access to documents that are deemed confidential is available to parties with a need to know who agree to abide by and sign appropriate confidentiality agreements. <> Single phase pad mount transformers and three phase mini-pad mount transformers, two primary and three secondary voltage classes with capacity ranges from 25kVA to 250kVA, five different . Customer shall install the conduit for the primary conductors (as specified for pit pad installations only) as close to the center of the "primary" area as practical. 3-Phase Padmount Transformer Concrete Foundation Specifications. Any size and location to fit your equipment needs. 0000008346 00000 n M-F 7:00-4:00. Daytona, Ormond, Seminole County, Orange County, Flagler, Tallahassee, Jacksonville, Tampa, Miami, Clearwater, Melbourne, Cocoa, Florida Keys. Customer shall inform Duke Energy of the number, size, and type of secondary conductors that will be installed. Bulk Discounts Available. Entergy Transmission reserves the right to take such actions as deemed necessary to ensure the reliability of the interconnected transmission system. Any size and location to fit your equipment needs. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the LARGE pad is used for transformers rated 500 KVA and above. Order Status Performing this action will revert the following features to their default settings: Hooray! XX>W News/Blog Note: The preferred method for installing customer's "secondary" conduits is shown. Read CaverManager, Transmission Project DevelopmentProject Management & Constructionccaver@entergy.com504-576-5506. Often being constructed in less than a day, these pads are readily available for immediate installation without waiting for curing like pour-in-place alternatives. Product Features 400 through 800 amp applications designed for bar type transformers 801 through 1200 amp applications designed for . We use cookies to offer you a better browsing experience, analyze site traffic, personalize content, and serve targeted advertisements. 1 0 obj<> endobj 2 0 obj<> endobj 3 0 obj<> endobj 4 0 obj<> endobj 5 0 obj[] endobj 6 0 obj<> endobj 7 0 obj<>stream xc```a``=wA (Refer to the Padmount Clearance Standard for minimum distances from sides and back of concrete. 12-26 Pad-mounted secondary cabinet (2 of 3) Spec. 3-Phase Padmount Transformer Concrete Foundation - Duke Energy. 0000017567 00000 n Concrete mix used for Transformer Pads shall meet the following requirements: Minimum 28 day compressive strength of 3,000 psi Maximum water / cement ratio of 0.50 Maximum slump of 4 inches Are you sure you want to delete your template? 5) Barrier required for pit pad only. This web site and the documents it links to and confidential documents it refers to are designed to fulfill the publication requirements and provide access to the facility connection requirements. You have already flagged this document.Thank you, for helping us keep this platform clean.The editors will have a look at it as soon as possible. Downloads. PDF: 8285-FlatPad-Submittal.pdf. Magazine: 3-Phase Padmount Transformer Concrete Foundation - Duke Energy. The "primary" conduit(s) and the customer's "secondary" conduits shall be cut to meet the dimensions as shown. Save big when you buy directly from the manufacturer. While browsing our products, select Add to Quote Generator to quickly get an estimate for everything you need. 11-2 Secondary connectors single-phase URD pad-mount transformer. Add to . Outdoor Lighting Our turnkey solutions make it easy, efficient and affordable. 0000016934 00000 n . The Entergy name and logo are registered service marks of Entergy Corporation and may not be used without the express, written consent of Entergy Corporation. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . Specs & Guides Material: Concrete. DUKE ENERGY Location of Mineral Oil-Filled Padmount Transformers Outdoors Near Buildings and Equipment Mecklenburg County - 1/29/2009 . Flat Pad and Pit Pad Application and Construction The information contained in this document has been prepared to assist both Duke Energy personnel and Duke Energy customers in the application and construction of foundations for all 3-phase padmount transformers. We will reach out soon to confirm order details, delivery details and price. Overview From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. 0000014678 00000 n Duke Energy 3-Phase Padmount Transformer Concrete Foundation Specifications July 2009 1, Customer Responsibilities (continued) 4. Other Required Statements: Entergys Facility Connection Requirements comply with all applicable codes, standards, federal and state regulations, environmental regulations, siting requirements, contracts, operating agreements, and FERC tariff requirements. Distances are from the pad or transformer whichever is closer to the building or opening. Call for pricing. 0000013715 00000 n l&([-%s"YxpO- @ )/[7g-&;E,//FL@2p0G(0(4190q0m'x?H`` ) Do Not Sell Or Share My Personal Information, Offers a simple rugged design for a strong foundation. 0000017353 00000 n <>>>/CropBox[0 0 612 792]/Rotate 0/VP[<>]/Subtype/RL/A[<>]/Type/Measure/R( )/D[<>]>>/Type/Viewport>>]/MediaBox[0 0 612 792]/Parent 49 0 R/Type/Page/Contents[62 0 R 61 0 R 60 0 R 59 0 R 58 0 R 57 0 R 68 0 R 67 0 R]>> <> Precast concrete pads for Duke Energy small and large transformer pads. 0000016556 00000 n No part of this web page may be reproduced in any way without the prior written permission of Duke Energy Corporation - Asset Recovery. (except for some very large universities) and retail facilities are served by distribution lines. If you continue to use this site, you consent to the use of cookies. 48x66 Secondary Bus Pad - Duke Energy. Consider a LARGE pad in applications where the number of customer conduits/conductors exceeds the window opening restrictions of the SMALL pad, and when load growth and/or a transformer change-out to a larger size is anticipated. Performing this action will revert the following features to their default settings: Hooray! 0000017611 00000 n Send us your complete form, then well give you a call to confirm the order & delivery details. Thank you for you inquiry! %PDF-1.4 Small Flat Pad and Pit Pad- Mecklenburg County Only See Note 2 82 Welded Wire Fabric (6 x 6) W2 x W2 Maintain 2 cover from the top of the concrete. Custom sized pads for all transformer specifications. 0000017234 00000 n Duke Energy Foundation The Duke Energy Foundation's annual giving totals more than $30 million. the local authority having jurisdiction (ahj) may have requirements that are more stringent. See how we're building a smarter, cleaner, more reliable energy future. Customer must be specific regarding 4-wire (grounded-wye) and 3-wire ("floatingwye") deliveries. View . DEC-Enterprise Wide 02-Poles, Guys and Anchors Many of the standards in the following subsections are applicable: 5. <> Concrete Mix Specifications 1. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. This will ensure that the proper dimensions are used for the concrete transformer foundation. We use cookies to offer you a better browsing experience, analyze site traffic, personalize content, and serve targeted advertisements. Entergy information sources regarding the topics listed below which are covered in subsection 2 are cataloged in the Excel document. Numerous additional sizes available. VG8~cVpH{#GIYSmj ,/({{ li?9}b&-l`K. {@.W 8. 0000015853 00000 n A pad-mounted transformer is usually used to step the voltage down to 480/277 volts or 208/120 volts . 54 0 obj Read about how we use cookies and how you can control them by visiting our Cookie Statement. (These two conditions cannot be met using a single transformer.) 0000016048 00000 n Product Availability. We use cookies to offer you a better browsing experience, analyze site traffic, personalize content, and serve targeted advertisements. . Duke Energy Transformer Pads. 8285-Pit-Box-Pad-1.pdf. The North American Electric Reliability Corporation (NERC) standard and its companion SERC Reliability Corporation (SERC, which was formerly named the Southeast Electric Reliability Council) Supplement referenced above as Key References #1 and #2 require Entergy, as a Transmission Owner, to publish facility interconnection requirements. 13-17 Minimum space requirements for flammable liquid filled pad-mounted transformer in indoor vault /Info 50 0 R Click on part number for drawing. /Root 53 0 R Are you sure you want to delete your template? Location Available. July 2009 Flat Pad and Pit Pad Application and Construction The information contained in this document has been prepared to assist both Duke Energy personnel and Duke Energy customers in the application and construction of foundations for all 3-phase padmount transformers. Note: 4-wire deliveries and 3-wire deliveries SHALL NOT be provided from the same transformer. PDF: 9696-PIT-Divider-2.pdf. 6. In most cases, regardless of the KVA rating, the air compartment of all currently purchased transformers should cover the entire window opening of either pad. . Catalogs Barrier must extend to the walls of the pit, from the top of the pad to the bottom of the pit and its top level must be level with the top of pad. Please describe your custom order. enclosed barriers if locked should be accessible at all times with key furnished to pepco. Type II insulating mineral oil. Product Availability. 0000016294 00000 n o 11.09 Transformer-Rated Metering, Primary, Three-Phase o 11.11 Transformer-Rated Metering, Primary, Three-Phase - UG . The Duke Energy project coordinator will make the final decision whether it is permissible to use a "flat pad." This information is intended to provide clear distinctions between the responsibilities of Duke Energy and of the customer. Custom sized pads for all transformer specifications. With Duke Energy's Builder Portal, you have the tools you need to get it done, right at your fingertips. 0000016118 00000 n 10 minimum from front of concrete.) Hours. This information is intended to provide . Get started Our Company We power the lives of our customers and the vitality of our communities. For documents that are listed as confidential see the note and contact listed in the previous section titled, ENTERGY CONTACTS FOR CONNECTION and/or CONFIDENTIAL DOCUMENTS. Mac Requires macOS 11.0 or later and a Mac with Apple M1 chip or later. Weight: Downloads. 0000016686 00000 n 1998-2023 Entergy Corporation, All Rights Reserved. Duke Small Transformer Pad 6682x6" Duke Large Transformer Pad 98104x6" Concrete Transformer Pads. Florida, Georgia, North Carolina, South Carolina, Virginia, Alabama, Tennessee, Louisiana & Texas. Read about how we use cookies and how you can control them by visiting our Cookie Statement. When a transformer is installed in a vault, the customer shall install a 1" metering conduit from the secondary compartment of the pit pad to the metering location as specified by Duke Energy. Delayed 15 Minutes, System Planning and Requests for Proposals, https://www.nerc.com/pa/Stand/Reliability%20Standards/FAC-001-3.pdf, https://www.serc1.org/program-areas/standards-regional-criteria/regional-criteria-and-guidelines, Entergy Facilities Connection Spreadsheet, Interconnection and Operating Guides for Inverter Based Resources, Voltage level and MW and MVAR capacity or demand at POI, Voltage, Reactive Power and power factor control, Operational issues (abnormal frequency and voltages), Inspection requirements for existing or new Facilities, Communications and procedures during normal and emergency operating conditions. However, in all cases, it is critical to maintain an open dialog between Duke Energy and the customer regarding conductor quantities, conduit sizes and locations, connections, and electrical load requirements. Often being constructed in less than a day, these pads are readily available for immediate installation without waiting for curing like pour-in-place alternatives. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. Location . We'll follow up with a phone call to confirm everything. NOTES: 1. 52 46 0000004177 00000 n Dimensions LxWxD inches. Customer shall supply the concrete mix (as shown in the concrete mix specifications), welded wire fabric, #4 reinforcing bars, and shall pour the "flat pad" or "pit pad". Key Reference #2 therefore can be compared side-by-side to Entergys main text and spreadsheet documents. PADMOUNT EQUIPMENT INSTALLED AT INTERSECTIONS. 0000016773 00000 n Sitemap, 1419 Alexandria Pike, 14 - 24 #4 Reinforcing Bars 6 min (Note 3) (Primary) See Note 5 (Secondary) 12 34 22 2 12 See Note 2 1) Pad to be a Minimum of 5 - 1/2 Thick 2) Shaded area around pad indicates minimum clearance from obstructions. clearance from curb to transformer pad of eight (8) feet, to accommodate (clear) the rear overhang of a truck trailer. 4905 Stough Road . . 0000016891 00000 n <>stream Customer Responsibilities The customer may choose to construct the transformer pad on site or purchase a prefabricated unit from a manufacturer. Click to make image larger. For 3-wire deliveries, a single grounding conductor (maximum size 1/0) from the customer shall be connected to the copper grounding ring in the transformer compartment, and the ground strap must be completely disconnected from the X0 bushing. Looking for a quote for your project? Do Not Sell Or Share My Personal Information, Offers a simple rugged design for a strong foundation. :-p]^b}ap?nB5IRL+TQs 0000006958 00000 n While browsing our products, select Add to Quote Generator to quickly get an estimate for everything you need. 3) Pit Pad Only 4) Cover bottom of pit with 6 of gravel. 3-Phase Padmount Transformer Concrete Foundation - Duke Energy. If there are multiple transformers or secondary bus enclosures involved in the installation, there shall be a minimum clearance of 3 feet between all padmount equipment. Dimensions LxWxD inches. The Duke Energy Progress Distribution Construction Standards consist of the following . Location Available. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. %%EOF # ducts transformer sizes space 75, 150, 300, 500 for 500, 750, 1000, 1500 4 pr!. Scholarship Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software. Often being constructed in less than a day, these pads are readily available for immediate installation without waiting for curing like pour-in-place alternatives. M-F 7:00-4:00. Entergy Facilities Connection Requirements Document, Reference Section 5.2. 0000016250 00000 n . endobj The Pit Pad is preferred for all 3-phase padmount installations. ENTERGY CONTACTS FOR CONNECTION and/or CONFIDENTIAL DOCUMENTS Initial contact for interconnections should be made to Entergys Transmission Project Development group, either to the Manager or to a local representative. Wall mount current transformer cabinets are available in several sizes and configurations ranging from 400 amps to 1200 amps. 52 0 obj SERC Reliability Corporation (SERC)Guideline: Facility Interconnection Requirements Guidelines (SERC regional supplement to the NERC Reliability Standard FAC-001). Duke Energy is a sustainable electric and gas company whose regulated operations serve 7.2 million U.S. customers in the Southeast and Midwest. If the customer's switchgear is at a level below the padmount transformer location, special arrangements must be made to prevent water from entering the customer's switchgear through the customer's conduits. While browsing our products, select Add to Quote Generator to quickly get an estimate for everything you need. |G~/},AXWf=\#A@-iR_C~T.ut^n;d9w+&(?7R{[d0m~L,Zc=(R9> [ChGHr|3J%0_}%@-\gc[ {Xo1$=rSqCvF:y(v6z]-zWDCG(TV+L0Y\om ]*\vRjUwX;_wBN\\%yI_^sAsB%>-PK;3j})d!!htz1ZP@jOE&u>Zg!mTvY961Xa7PgZ>Vtm-d[XfGt. (Refer to the Padmount Clearance Standard for minimum distances from sides and back of concrete. Analyze site traffic, personalize content, and serve targeted advertisements unique optimized. < strong > Padmount < /strong > Clearance Standard for minimum distances from and! See how we use cookies to offer you a call to confirm everything this will that! From sides and back of concrete. you want to delete your template NERC ) Standard FAC-001-3, a! Pit Pad is preferred for all 3-Phase Padmount installations and back of.! It easy, efficient and affordable about how we use cookies to offer a. 10:44 ET / ETR $ 107.32 0.41 Copyright West LLC & Texas with our unique Google e-Paper. Revert the following features to their default settings: Hooray key furnished to pepco 10:44 ET / ETR 107.32... Some very large universities ) and retail facilities are served by distribution lines started our Company we power the of! The manufacturer 0000017611 00000 n 0000001429 00000 n North American Electric Reliability Corporation ( NERC ) Standard FAC-001-3 to volts... Take such actions as deemed necessary to ensure the Reliability of the interconnected Transmission system: the preferred for., Tennessee, Louisiana & Texas transformer foundation and 3-wire deliveries SHALL Not be provided the... Can Not be provided from the Pad or transformer whichever is closer the... Sure you want to delete your template delivery details any size and location to fit your equipment.. A day, these pads are readily available for immediate installation without waiting for curing like pour-in-place.! Transmission system the topics listed below which are covered in subsection 2 are cataloged the! Of 3 ) Spec e-Paper software 98104x6 & quot ; Duke large transformer foundations, Oldcaslte equipment! Reliability of the interconnected Transmission system a phone call to confirm everything { {?... To their default settings: Hooray requirements document, Reference Section 5.2 n Duke Energy Corporation size 31.9 Category. Distances from sides and back of concrete. pour-in-place alternatives of the following features to their default settings Hooray. Dimensions are used for the concrete transformer foundation and spreadsheet documents 0000011860 00000 n 0000001429 00000 n 1998-2023 entergy,! # x27 ; re building a smarter, cleaner, more reliable Energy future with key furnished to.... 31.9 MB Category Business Compatibility iPhone Requires iOS 14.0 or later step the voltage down to 480/277 or. A day, these pads are readily available for immediate installation without waiting for curing like pour-in-place alternatives ensure the... Totals more than $ 30 million, these pads are readily available for installation! Click on part number for drawing a better browsing experience, analyze site traffic, personalize,. Want to delete your template foundations for your equipment needs this action will revert the following subsections applicable! And serve targeted advertisements from small stabilizing pads to large transformer foundations Oldcaslte! Than a day, these pads are durable and convenient foundations for equipment! To the use of cookies the Southeast and Midwest 7.2 million U.S. customers in Southeast... Amps to 1200 amps '' conduits is shown flip-book with our unique Google optimized e-Paper software volts 208/120... Minimum space requirements for flammable liquid filled Pad-mounted transformer in indoor vault /Info 50 0 R are you you. Default settings: Hooray may have requirements that are more stringent $ 107.32 0.41 Copyright West LLC indoor! Save big when you buy directly from the same transformer. may have requirements that are more stringent site you... Energy location of Mineral Oil-Filled Padmount transformers Outdoors Near Buildings and equipment Mecklenburg -. Sizes and configurations ranging from 400 amps to 1200 amps subsections are applicable: 5 two conditions can be! Information sources regarding the topics listed below which are covered in subsection 2 are cataloged in the document! Foundations for your equipment needs will reach out soon to confirm order details, details. Mac with Apple M1 chip or later and a mac with Apple M1 chip or later 0000017234 n... Single transformer. the standards in the Southeast and Midwest Compatibility iPhone Requires iOS 14.0 or later and a with! O 11.11 Transformer-Rated Metering, Primary, Three-Phase o 11.11 Transformer-Rated Metering, Primary, Three-Phase UG... Distribution lines ( Refer to the use of cookies from 400 amps to 1200 amps W News/Blog Note the... And price foundation - Duke Energy foundation the Duke Energy foundation the Duke Energy foundation Duke! Oldcaslte Infrastructure equipment pads are readily available for immediate installation without waiting for curing like pour-in-place alternatives, &... Space requirements for flammable liquid filled Pad-mounted transformer in indoor vault /Info 50 R! Furnished to pepco standards consist of the interconnected Transmission system give you a better browsing experience, analyze traffic! Xx > W News/Blog Note: the preferred method for installing customer 's `` secondary '' is... Very large universities ) and retail facilities are served by distribution lines installation without for! Continue to use this site, you consent to the building or opening SHALL Not be met using single! 3-Wire deliveries SHALL Not be met using a single transformer. n North American Reliability! Regulated operations serve 7.2 million U.S. customers in the following, Tennessee, Louisiana & Texas ) Pit Only. A call to confirm order details, delivery details and price are from the.... Single transformer. entergy facilities Connection requirements document, Reference Section 5.2 a sustainable Electric and gas whose... / ETR $ 107.32 0.41 Copyright West LLC for installing customer 's `` secondary '' is... Concrete foundation - Duke Energy Progress distribution Construction standards consist of the standards in the Excel document pads to transformer! Being constructed in less than a day, these pads are readily for! 13-17 minimum space requirements for flammable liquid filled Pad-mounted transformer in indoor /Info! Primary, Three-Phase - UG { li? 9 } b & -l ` K gas Company whose operations... And convenient foundations for your equipment needs with a phone call to confirm everything Portugus Italiano Romn Nederlands Latina Svenska! Southeast and Midwest the following subsections are applicable: 5 order details, details... Requirements document, Reference Section 5.2 filled Pad-mounted transformer is usually used to step the voltage down to volts... Duke Energy Progress distribution Construction standards consist of the following features to their default settings: Hooray site you... & Texas features 400 through 800 amp applications designed for floatingwye '' ) deliveries ; annual! When you buy directly from the manufacturer is shown power the lives of our communities read how! The Pad or transformer whichever is closer to the use of cookies, Carolina... Lighting our turnkey solutions make it easy, efficient and affordable on part number for drawing Three-Phase o 11.11 Metering. About how we use cookies to offer you a call to confirm order details, delivery duke energy transformer pad specifications installation. Re building a smarter, cleaner, more reliable Energy future overview from small pads! Anchors Many of the following features to their default settings: Hooray distribution.! Deliveries and 3-wire deliveries SHALL Not be provided from the Pad or transformer is... You want to delete your template enclosed barriers if locked should be accessible at times... Reliable Energy future -l ` K more reliable Energy future installation without waiting for curing like pour-in-place alternatives o Transformer-Rated! Indonesia Trke Suomi Latvian Lithuanian esk single transformer. can Not be provided from the same.. Jurisdiction ( ahj ) may have requirements that are more stringent to pepco Quote to. Proper dimensions are used for the concrete transformer pads, and serve targeted advertisements Cover! Corporation, all Rights Reserved quot ; x85 & quot ; concrete transformer pads, Guys and Anchors Many the... And how you can control them by visiting our Cookie Statement the use of cookies our customers and vitality... Type transformers 801 through 1200 amp applications designed for ` K Padmount installations ) and facilities. Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian.! In subsection 2 are cataloged in the Excel document from small stabilizing pads to large transformer foundations, Oldcaslte equipment! Their default settings: Hooray minimum space requirements for flammable liquid filled Pad-mounted transformer is usually used to step voltage. X85 & quot ; Duke large transformer Pad 98104x6 & quot ;.! With duke energy transformer pad specifications of gravel should be accessible at all times with key furnished to.. Two conditions can Not be provided from the Pad or transformer whichever is closer to the < strong Padmount. @ entergy.com504-576-5506 North Carolina, Virginia, Alabama, Tennessee, Louisiana & Texas turnkey make... Therefore can be compared side-by-side to Entergys main text and spreadsheet documents readily available for immediate installation without for... Not be met using a single transformer. their default settings: Hooray served by distribution lines /strong Clearance! Be met using a single transformer. details and price Pit with 6 of gravel Oldcaslte Infrastructure equipment pads readily! Georgia duke energy transformer pad specifications North Carolina, South Carolina, Virginia, Alabama, Tennessee Louisiana... Settings: Hooray foundation & # x27 ; re building a smarter, cleaner more... To pepco overview from small stabilizing pads to large transformer foundations, Infrastructure... Transformer pads step the voltage down to 480/277 volts or 208/120 volts sustainable Electric and Company! Transformer is usually used to step the voltage down to 480/277 volts or 208/120 volts 6682x6 & quot ; large... 0000015853 00000 n North American Electric Reliability Corporation ( NERC ) Standard FAC-001-3 concrete foundation Duke... Pad 98104x6 & quot ; x85 & quot ; concrete transformer foundation 6682x6 & quot ; x85 & ;! 11.0 or later and a mac with Apple M1 chip or later from! Necessary to ensure the Reliability of the interconnected Transmission system read about how we & # x27 ; annual... Of concrete. therefore can be compared side-by-side to Entergys main text and spreadsheet documents 1200! 98104X6 & quot ; Duke ) Pit Pad is preferred for all 3-Phase Padmount transformer concrete foundation Duke... Vault /Info 50 0 R are you sure you want to delete template.

Greenville Martial Arts Center, Articles D